Harper College - Schaumburg Airport Hangar Buildout

The Work consists of but is not limited to the following for the Schaumburg Airport Hangar Buildout: selective demolition of general, electrical, and mechanical trade work; interior stud and shaft wall installation; painting; and electrical and mechanical work.
Plans (click to expand/collapse)
Name Size
01_T1.00 336.5 KB
02_G0.00 160.6 KB
03_G0.01 391.9 KB
04_G0.02 149.7 KB
05_G1.10 227.1 KB
06_G2.00 394.5 KB
07_G2.10 1.0 MB
08_G2.20 369.5 KB
09_S0.1 178.7 KB
10_S0.2 159.1 KB
11_S1.10 241.0 KB
12_AD1.10 258.1 KB
13_A1.10 281.2 KB
14_A6.00 318.3 KB
15_A6.10 210.5 KB
16_A9.00 252.9 KB
17_A10.10 311.6 KB
18_ME1.00 711.6 KB
19_HV1.00 452.5 KB
20_HV2.00 693.5 KB
21_HV3.00 389.2 KB
22_ED1.00 372.0 KB
23_E1.00 497.3 KB
24_E1.10 328.9 KB
25_E2.00 602.1 KB
26_E2.01 501.7 KB
27_E2.02 372.4 KB
28_E3.01 355.7 KB
29_E4.01 875.6 KB
30_E4.02 685.8 KB