Harper College - Schaumburg Airport Hangar Buildout
The Work consists of but is not limited to the following for the Schaumburg Airport Hangar Buildout: selective demolition of general, electrical, and mechanical trade work; interior stud and shaft wall installation; painting; and electrical and mechanical work.
Plans
(click to expand/collapse)

Name | Size | ||
01_T1.00 | 336.5 KB | ||
02_G0.00 | 160.6 KB | ||
03_G0.01 | 391.9 KB | ||
04_G0.02 | 149.7 KB | ||
05_G1.10 | 227.1 KB | ||
06_G2.00 | 394.5 KB | ||
07_G2.10 | 1.0 MB | ||
08_G2.20 | 369.5 KB | ||
09_S0.1 | 178.7 KB | ||
10_S0.2 | 159.1 KB | ||
11_S1.10 | 241.0 KB | ||
12_AD1.10 | 258.1 KB | ||
13_A1.10 | 281.2 KB | ||
14_A6.00 | 318.3 KB | ||
15_A6.10 | 210.5 KB | ||
16_A9.00 | 252.9 KB | ||
17_A10.10 | 311.6 KB | ||
18_ME1.00 | 711.6 KB | ||
19_HV1.00 | 452.5 KB | ||
20_HV2.00 | 693.5 KB | ||
21_HV3.00 | 389.2 KB | ||
22_ED1.00 | 372.0 KB | ||
23_E1.00 | 497.3 KB | ||
24_E1.10 | 328.9 KB | ||
25_E2.00 | 602.1 KB | ||
26_E2.01 | 501.7 KB | ||
27_E2.02 | 372.4 KB | ||
28_E3.01 | 355.7 KB | ||
29_E4.01 | 875.6 KB | ||
30_E4.02 | 685.8 KB |