Harper College - Schaumburg Airport Hangar Buildout
The Work consists of but is not limited to the following for the Schaumburg Airport Hangar Buildout: selective demolition of general, electrical, and mechanical trade work; interior stud and shaft wall installation; painting; and electrical and mechanical work.
Addendum #1
(click to expand/collapse)

Name | Size | ||
Addendum #1 | 9.9 MB |
Addendum #2
(click to expand/collapse)

Name | Size | ||
Addendum #2 | 2.5 MB |