Harper College - Schaumburg Airport Hangar Buildout

The Work consists of but is not limited to the following for the Schaumburg Airport Hangar Buildout: selective demolition of general, electrical, and mechanical trade work; interior stud and shaft wall installation; painting; and electrical and mechanical work.
Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 9.9 MB
Addendum #2 (click to expand/collapse)
Name Size
Addendum #2 2.5 MB