Lyons THSD 204 - 2025 Mechanical Replacement & Remodeling at North Campus

The Work includes the full interior remodeling at several toilet rooms including but not limited to, the replacement of several indoor air handlers, associated large ductwork, new lay-in ceilings/light fixtures (several classrooms/hallways) along with new extended ductwork, new rooftop cooling tower and associated chiller, rooftop re-framing, Corridor wall extensions above ceiling and mechanical equipment and piping replacement at both campuses.
Plans (click to expand/collapse)
Name Size
01_G0.1 269.7 KB
02_AD1.0A 378.7 KB
03_AD1.1A 440.7 KB
04_AD1.1BC 323.9 KB
05_AD1.2A 438.8 KB
06_AD1.2BC 295.5 KB
07_AD1.3A 436.7 KB
08_AD1.3B 292.3 KB
09_AD1.4 236.2 KB
10_AD1.5 226.9 KB
11_A1.4A 232.1 KB
12_A1.4B 239.1 KB
13_A2.1 247.9 KB
14_A4.1 218.5 KB
15_A4.2 224.3 KB
16_A8.0A 301.6 KB
17_A8.1A 332.1 KB
18_A8.1BC 282.6 KB
19_A8.2A 331.1 KB
20_A8.2BC 279.1 KB
21_A8.3A 322.8 KB
22_A8.3B 270.4 KB
23_A8.5 235.5 KB
24_MD1.0 558.0 KB
25_MD1.1 568.4 KB
26_MD1.2 638.9 KB
27_MD1.3 611.5 KB
28_MD1.4 377.1 KB
29_MD1.1S 406.3 KB
30_M1.0 560.7 KB
31_M1.1 555.6 KB
32_M1.2 708.5 KB
33_M1.3 657.4 KB
34_M1.4 328.2 KB
35_M1.5 387.6 KB
36_M3.1 454.0 KB
37_M3.2 491.0 KB
38_M3.3 404.7 KB
39_M3.4 395.2 KB
40_M3.5 400.5 KB
41_M1.1S 434.5 KB
42_M4.1 408.4 KB
43_M4.2 346.6 KB
44_M4.3 339.0 KB
45_M5.1 298.8 KB
46_M5.2 296.2 KB
47_M5.3 292.9 KB
48_P1.3 378.5 KB
49_P1.4 299.3 KB
50_E0.0 447.6 KB
51_EM1.0 505.3 KB
52_EM1.4 322.2 KB
53_ED1.0 506.8 KB
54_ED1.1 555.4 KB
55_ED1.2 728.0 KB
56_ED1.3 583.8 KB
57_E1.0 389.1 KB
58_E1.1S 452.4 KB
59_E1.2 403.9 KB
60_E1.4AB 367.5 KB
61_E1.4C 366.6 KB
62_E3.0A 626.7 KB
63_E3.1 693.2 KB
64_E3.2 468.8 KB
65_E3.3 478.1 KB
66_E3.4 368.4 KB
67_E4.0 366.3 KB
68_E5.0 364.7 KB
69_E6.0 380.4 KB