Village of West Dundee - Phase 1 Lead Service Line Replacement Program

The proposed construction consists of the replacement of 223 lead and galvanized requiring replacement water service lines with copper water service lines via directional drilling methods. The contract will include all work necessary to restore the roadway and perform all restoration to return the area to its original condition where specified, and other miscellaneous items of work.
Specifications (click to expand/collapse)
Name Size
Project Manual 78.5 MB