VIllage of South Elgin - 2025 Water Main Replacement

The proposed construction consists of approximately 4,874 lineal feet of 8-inch water main replacement, 451 lineal feet of 6-inch water main replacement, fire hydrants, valves and vaults, water service replacements, temporary parkway and local street pavement restoration, and other miscellaneous items of work.
Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 228.8 KB