Riverside SD 96 - 2025 Masonry Repair at Hauser ES
The work includes, but is not limited to, Masonry Repair Work involving complete masonry and stone tuckpointing of the entire building and steel lintel repair work at Hauser Jr. High School and all work as indicated in the drawings and specifications. Refer to the Drawings and Project Manual for the full extent of the Work.
Plans
(click to expand/collapse)