Valley View CUSD 365U - 2025 Parking Lot Replacement at Irene King ES
Base Bid work includes but is not limited to, the complete full-depth removal of areas indicated of the existing sidewalk and concrete curbing and all associated work and the installation of new full depth sidewalk, ADA accessible ramps, concrete curbing, and storm utility work as indicated.
Project Manual
(click to expand/collapse)
Name | Size | ||
Project Manual | 8.5 MB |