Community Utilities of IN - Twin Lakes IN - WWTP Headworks Improvements
The proposed construction consists of 1) new structures including a metal framed/metal sided Headworks Building with mechanical screening/washer/compactor, concrete channels, Alum Storage Tank, Parshall Flume, Flow Control Influent Channel; 2) modifications to existing structures including Comminutor Channel and Flow Control Structure; 3) site piping, site grading, lighting, electrical and controls work, and other miscellaneous items of work
Project Manual
(click to expand/collapse)
Name | Size | ||
Project Manual | 62.9 MB |