Newark CHSD18 - 2025 FACS & Biology Room Remodeling at Newark Community HS

The work in general includes, but is not limited to, the renovation of the FACS Room and Biology Room including flooring, casework, ceilings, lighting, and Mechanical. Work is to be awarded as a single contract.
Plans (click to expand/collapse)
Name Size
01_G0.1 187.6 KB
02_AM.1 336.0 KB
03_AD1.1 203.6 KB
04_AD8.1 275.1 KB
05_A1.1 370.6 KB
06_A2.1 389.3 KB
07_A7.1 546.7 KB
08_A8.1 236.6 KB
09_A9.1 443.4 KB
10_ME1.0 703.4 KB
11_ME1.1 316.1 KB
12_DHV1.1A 407.3 KB
13_DHV1.1B 553.7 KB
14_HV1.1A 533.4 KB
15_HV1.1B 503.8 KB
16_HV1.2 246.5 KB
17_HV4.0 601.0 KB
18_HV5.0 393.0 KB
19_PD1.1 593.7 KB
20_PD1.2 538.7 KB
21_P1.1 759.7 KB
22_P1.2 753.8 KB
23_P2.1 854.9 KB
24_P2.2 758.4 KB
25_DE1.1A 353.2 KB
26_DE1.1B 344.9 KB
27_E1.0A 276.7 KB
28_E1.1 525.4 KB
29_E1.1A 414.1 KB
30_E1.1B 434.9 KB
31_E4.1 711.1 KB
32_E4.2 692.0 KB
33_E5.1 428.5 KB
34_E7.1 528.0 KB
35_E8.1A 323.1 KB
36_E8.1B 411.1 KB