Rochelle THSD 212 - 2025 LMC Renovation at Rochelle Township HS
Project consists of interior improvements including: demolition, light gauge metal framing, gypsum board, hollow metals frames, wood doors, interior glazing, moveable glass partitions, acoustical ceiling grid, acoustical ceiling panels, acoustical wall paint, flooring, electrical, lighting, HVAC and other Work indicated in the Contract Documents.
Plans
(click to expand/collapse)
Name | Size | ||
01_COVER | 184.7 KB | ||
02_S-131 | 291.7 KB | ||
03_A-000 | 166.4 KB | ||
04_A-111 | 257.8 KB | ||
05_A-121 | 217.6 KB | ||
06_A-131 | 226.1 KB | ||
07_A-141 | 420.2 KB | ||
08_A-161 | 201.2 KB | ||
09_A-411 | 239.0 KB | ||
10_A-412 | 242.1 KB | ||
11_A-511 | 190.7 KB | ||
12_A-601 | 199.1 KB | ||
13_A-602 | 153.4 KB | ||
14_FP-131 | 1.7 MB | ||
15_HV-131 | 1.2 MB | ||
16_E-001 | 224.7 KB | ||
17_E-002 | 210.6 KB | ||
18_E-121 | 400.5 KB | ||
19_E-131 | 564.8 KB | ||
20_E-401 | 227.4 KB | ||
21_E-501 | 436.3 KB | ||
22_E-502 | 291.9 KB |