Village of Cary - Fox Trails No. 1 Lift Station Replacement

The proposed construction consists of replacement of an existing municipal wastewater lift station with a new lift station consisting of concrete wet well, concrete valve vault, two 15 hp submersible pumps, valves, piping, electrical control panel, natural gas emergency generator, 22 lineal feet of 15” sewer, 165 lineal feet of 8” force main, HMA driveway, temporary bypass pumping, abandonment of existing lift station, surface restoration, and other miscellaneous items of work.
Plans (click to expand/collapse)
Name Size
Plans 10.6 MB