Waukegan National Airport - Collapsed Culvert Replacement
Removal and replacement of the existing 24” collapsed culvert outlet pipe (corrugated metal pipe) for the southwest detention basin with 24” reinforced concrete pipe. Re-grading of the existing berm above the new culvert. Landscaping and erosion control measures
Project Manual w/ 11x17 Plans
(click to expand/collapse)
Name | Size | ||
Project Manual | 2.5 MB |