Village of West Dundee - Well No. 1 MCC Replacement
The project includes the removal of the existing MCC at the Well No. 1 Building. New power distribution equipment will be installed in the electrical room. All existing loads will be reconnected to the new power distribution equipment. The existing utility service will be modified to a 4-Wire service along with a new service disconnect and meter cabinet. There will be an alternate to deduct pricing for a new Automatic Transfer Switch and Generator Docking station.
Plans
(click to expand/collapse)
Name | Size | ||
Plans | 2.5 MB |