Lewis University Airport - Apron 200 Large Aircraft Storage Hangar
This work shall consist of the furnishing, installation, maintenance, relocation, and removal of work zone traffic control and protection, and will be in accordance with the Plans, Plan details, and the guidelines specified in FAA Advisory Circular 150/5320-2 (current issue). The item shall also include the provision of sweepers for pavement cleaning, and flaggers and radio equipment for traffic control, as shown in the Construction Safety and Phasing Plan and as specified in the Specifications.
Plan Holders
Date | Company | Contact | Bid Categories |
3/24/25 3:35 pm |
Metalmaster Roofmaster Inc.
4800 Metalmaster Way McHenry, IL 60050 |
Dan Smeja
Principal
Tel: 815-459-6415
Fax: 815-459-6596
|
Thermal & Moisture Protection |
3/24/25 1:34 pm |
Metropolitan Corporation
141 Matteson Street Unit A Dyer, IN 46311 |
Dan Dorman
Tel: 708-201-0870
Fax: 708-201-1068
|
Carpentry Doors/Frames/Hardware General Contractor |