Streator THSD 40 - 2025 AG Building at Streator Township HS

Project consists of construction of a new steel pre-fabricated AG building, that includes site work, site utilities, site lighting, concrete paving, concrete foundations, and site restoration of areas disturbed by new building construction as well as other Work indicated in the Contract Documents.
Addendum #1 (click to expand/collapse)
Name Size
Addendum #1 2.4 MB