Sycamore Park District - Riverside Park Phase 2 Parking Lot Improvements

Major work elements include the construction of a 175-stall paved asphalt parking lot, topsoil stripping, site grading, storm sewer installation, concrete sidewalks and curblines, an asphalt sidewalk, and site restoration and seeding
Plans (click to expand/collapse)
Name Size
01_C-1.0 1.5 MB
02_C-2.0 280.2 KB
03_C-3.0 775.6 KB
04_C-3.1 554.1 KB
05_C-4.0 449.7 KB
06_C-5.0 972.9 KB
07_C-6.0 407.3 KB
08_C-7.0 509.7 KB
09_C-8.0 491.3 KB
10_C-8.1 274.1 KB
11_C-9.0 715.8 KB
12_C-9.1 605.3 KB